The pipeline described in Problem 6.7.1 is used to batch ANS crude along with a light crude (0.85 specific gravity and 15 cSt viscosity at 60Β°F). Determine the optimum batch sizes to reduce pumping costs based on a 30 day operation. Consider a flow rate of 6000 bbl/hr.
The pipeline described in Problem 6.7.1 is used to batch ANS crude along with a light crude (0.85 specific gravity and 15 cSt viscosity at 60Β°F). Determine the optimum batch sizes to reduce pumping costs based on a 30 day operation. Consider a flow rate of 6000 bbl/hr.
The pipeline described in Problem 6.7.1 is used to batch ANS crude along with a light crude (0.85 specific gravity and 15 cSt viscosity at 60Β°F). Determine the optimum batch sizes to reduce pumping costs based on a 30 day operation. Consider a flow rate of 6000 bbl/hr.

Problem 6.7.1

📝 Need Help With This Topic?

Get a custom-written paper by an expert in this subject. Plagiarism-free, on time, any citation style.

  • ✓ PhD & Masters qualified writers
  • ✓ Turnitin-safe β€” 0% similarity
  • ✓ Free revisions + money-back guarantee
Get My Paper Now

From $11/page · All academic levels

A pipeline 150 miles long from Beaumont pump station to a tank farm at Glendale is used to transport Alaskan North Slope crude oil (ANS crude). The pipe is 20 in. in outside diameter and constructed of X-52 steel. It is desired to operate the system at ANSI 600 pressure level (1440 psi). The pipeline profile is such that there are two peaks located between Beaumont and Glendale. The first peak occurs at milepost 65.0 at an elevation of 1500 ft. The second peak is located at milepost 110.0 at an elevation of 2500 ft. Beaumont has an elevation of 350 ft and Glendale is situated at an elevation of 650 ft. During the initial phase of operation, 6000 bbl/hr of ANS crude will be pumped at a temperature of 60Β°F and delivered to Glendale tankage at a pressure of 30 psi. The specific gravity and viscosity of ANS crude at 60Β°F may be assumed to be 0.895 and 43 cSt respectively.

(a) Determine the minimum wall thickness required to operate the pipeline system at a pressure of 1400 psi.

🌟 Writers Who Have Helped Students Like You

Our expert writers specialise in this subject and deliver original, well-researched papers.

S
Dr. Sarah M.★★★★★ 4.97 Β· 1,240 orders
Nursing & Healthcare Β· PhD Edinburgh
J
Prof. James K.★★★★★ 4.95 Β· 980 orders
Business & Law Β· MBA London

(b) At a flow rate of 6000 bbl/hr, how many pump stations would be required?

(c) During the second phase it is planned to expand the capacity of pipeline to 9000 bbl/hr. How many additional pump stations would be required? (d) Assuming 80% pump efficiency, calculate the total pumping HP required during the initial phase and under the expansion scenario. Use a minimum suction pressure of 50 psi at each pump station.

🎉 100% Satisfaction Guaranteed β€” or Your Money Back

Join 12,400+ students who trust us with their academic success. Every order includes: free revisions within 30 days, plagiarism report, on-time delivery guarantee, and full confidentiality.

★★★★★

4.9/5 from 12,400+ reviews

Order & Get 25% Off

—

The pipeline described in Problem 6.7.1 is used to mix ANS crude with light crude (0.85 specific gravity and 15 cSt viscosity at 60Β°F). Determine the best batch sizes to reduce pumping expenses during a 30-day period. Take a look at a flow rate of 6000 bbl/hr.
The pipeline described in Problem 6.7.1 is used to batch ANS crude and light oil (0.85 specific gravity and 15 cSt viscosity at 60Β°F). Determine the best batch sizes to reduce pumping expenses during a 30-day period. Take a look at a flow rate of 6000 bbl/hr.
The pipeline described in Problem 6.7.1 is used to batch ANS crude and light oil (0.85 specific gravity and 15 cSt viscosity at 60Β°F). Determine the best option.